AI and data laws

311 moving · 704 enacted

TexasTexasBillHB 3970

Interconnection and operation of large loads

Would have set rules for interconnecting and operating large electric loads such as data centers on the ERCOT grid.

FailedIntroducedCommitteeFloorLawFailed

Died in Senate committee when the regular session adjourned sine dieMay 15, 2025 1 year ago

Body
Texas Legislature
Session
2025
Introduced
Mar 6, 2025
Votes
House 142-0
Sponsors
R (Republican)Republican

Timeline

  1. May 15, 2025 1 year ago

    Senate: Referred to Business & Commerce

  2. May 1, 2025 1 year ago

    Passed the House

  3. Mar 6, 2025 1 year ago

    Filed in the House

Sponsors

  • R (Republican)Drew Darby
Texas
TexasSB 6

Large loads and grid reliability (data centers)

Sets interconnection standards, cost-sharing, disclosure and emergency curtailment rules for large electric loads of 75 megawatts or more, such as data centers, in the ERCOT region.

In force
Texas
TexasSB 1929

Registration of crypto mining large loads

Requires virtual currency mining facilities in the ERCOT region with more than 75 megawatts of interruptible load to register with the Public Utility Commission as large flexible loads.

In force
United Kingdom
United Kingdomunverified

British Data Centre Covenant

The UK government unveiled a covenant setting local job, community investment, and water protection standards for data centers seeking faster grid connections.

Proposed
United States (federal)

Ratepayer Protection Act

The bill would require state utility regulators to consider whether large electricity users, including data centers, are driving up costs for other ratepayers.

Passed one chamber

Change log

  • AddedAdded to the list. Set by hand from the official record.Sep 27

Summaries of public legislative records, executive actions and court rulings, for reference, not legal advice. Check the official page linked on each item. First seen 2026-09-27. Checked against the official source.